578 MW
Connected Capacity
1,289 MW
Contracted Capacity
1,702 MW
Total Potential Capacity
What we do
Infrastructure specifications.
Location
Pyote, Ward County, Texas (ERCOT), USA
Power
300 MW total capacity · Dedicated on-site substation · Direct ERCOT connection
Cooling
High-density air cooling · Liquid-to-chip deployment ready
Connectivity
Dual diverse fiber entry routes · Multiple Tier-1 carrier paths
Resilience
N+1 electrical and mechanical redundancy · Industrial-grade continuous duty
Availability
Active facility · Custom capacity allocations available upon inquiry