Explore our data center portfolio.

Filter by region, power capacity, and operational readiness to find the right environment for your deployment.

Talk to us

578 MW

Connected Capacity

1,289 MW

Contracted Capacity

1,702 MW

Total Potential Capacity

Capacity

How capacity is counted.

Connected capacity

The total maximum power capacity allocated to a data center site under applicable regulatory approvals and power supply arrangements which is currently connected to a power grid, and which can be technically utilized based on installed and energized electrical infrastructure, including distribution transformers and related power systems. It is determined from the operationally permitted load of installed transformers, which may be calculated as a percentage of aggregate maximum nominal transformer capacity to reflect engineering design limits, redundancy requirements, thermal constraints and continuous load ratings.

Contracted capacity

The maximum power capacity, in MW, that we are allowed and plan to deploy at each data center pursuant to the relevant power purchase agreement in effect and as permitted by the local regulatory body, if applicable.

Total potential capacity

The maximum estimated power capacity, in MW, that we anticipate after all expansions at existing data center locations that depend on extending the current power purchase agreements. These opportunities are under discussion with power providers, utilities and regulators, and there is no assurance that the capacity will be secured.

Find your location.

Explore the United States and Europe.

Beyond the facility boundary.

Explore the Greenhouse project and its approach to reusing data center heat.

Greenhouse

CEO note

Andrey Kim, CEO

“We built SWI Digital on a belief that has held for nearly a decade: building and running digital infrastructure at scale takes years to learn, and few do all of it well. We have spent ten years acquiring energy, developing sites and operating data centers at industrial scale - first for digital assets, now for AI. It is difficult, capital-intensive, long-term work. It is also exactly what we set out to do.”

Andrey Kim

CEO

Planning a deployment?

Tell us your preferred location, capacity requirements and target timeline. We will connect you with the relevant team.