40 MW
Connected Capacity
45 MW
Contracted Capacity
45 MW
Total Potential Capacity
What we do
Infrastructure specifications.
Location
Karaganda, Kazakhstan
Power
45 MW. Substation Utility
Cooling
[Confirmed configuration]
Connectivity
[Confirmed providers / routes]
Resilience
[Confirmed design / certifications]
Availability
Contact the site team